AB326
This unique heated towel rack features an iconic blend of Chinese Red and brushed gunmetal grey, crafted with 304 stainless steel through precision bending and curved craftsmanship—a highly complex manufacturing process that embodies advanced technological sophistication and has become a favorite among designers. As the epitome of luxury in heated towel racks, it is ideal for large villas and hotel bathrooms. Equipped with carbon fiber heating technology, it enables smart temperature and time control for seamless integration into modern intelligent living systems.
Size:H1500*W500
Power:150W
Product details
| TR Style |
Frame Style |
|---|---|
| TR Featured Design |
Large Area Drying |
| TR Function Setting |
Heating |
| TR Body Material |
304 Stainless Steel |
| TR Color |
Gunmetal |
| TR Heating Method |
Carbon Fiber Heating |
| TR Controller |
Touch Screen Control |
| TR Time Control |
1-8 Hours |
| TR Temperature Control |
45-65℃ (113-149℉) |
| TR Rods |
>9 |
| TR Height Range |
>1200mm |
| TR Width Range |
450-550mm |
| TR Waterproof Rating |
IPX 4 |
| TR Wire Position |
Lower Middle |
| TR Installation Method |
Without Power Plug |
| Product Types |
Heated Towel Rack |
Ordering Information
MOQ Requirement
- Our MOQ is 50pcs per item.
- After placing your order, our specialized sales staff will provide you with up-to-date information on every step of the production process.
- If you need any graphic or 3D designs about your orders to help your promotion works, our professional designers can help.
Lead time
- Samples can be offered within 10-15 days.
- Lead time: Usually 30-60 days and 60-90 days at peak season.
- Payment Terms: T/T 50% deposit, 50% balance before loading.
- Free for laser logos.
- Default inner or outer box is 5-ply corrugated brown carton and packed without pallet.
- If you need color box package, it will take extra charges and MOQ is 200pcs per item.
Shipping
- Samples can be delivered by express within 7-10 days.
- LCL by shipping is welcome as well.
- Bulk orders are delivered by shipping within 1-3 months depends on different countries.







